Quick answer
Heber City's Building Department (435-654-6330, 75 N Main Street) takes every permit through its online portal and collects fees at the end of review. Its design criteria call for a 36-inch frost depth, a ground snow load looked up by address on the USU map, Seismic Design Category D and required ice barriers. Residential submittals include the city's Fire Hazard Severity Form. Contractors may work 7 a.m. to 10 p.m.
Heber City sits at about 5,600 feet in the Heber Valley, and its building criteria are written for a cold, snowy mountain town. The Building Department spells them out on its main page, so you can check a builder's plans against them.
Who to call
From the city's Building Safety Division page:
- Building Department: 75 N Main Street, Heber City, UT 84032
- Phone: 435-654-6330; email: [email protected]
- Office hours: Monday through Thursday, 7:30 a.m. to 6 p.m.
- Inspection hours: Monday through Thursday, 7:30 a.m. to 4:30 p.m.
- Chief Building Official: Curt Davis, 435-503-4903
- Public Works emergency line: 435-654-3275
Contractors may work 7 a.m. to 10 p.m. under the city's sound ordinance.
Applying
Every permit is applied for, completed and paid for through the city's Online Permit Portal. Fees are paid at the end of the review, before the permit is issued. The submittal requirements page has PDFs for:
- residential building submittals
- basement finishes, remodels and decks
- solar panels
- commercial buildings and tenant finishes (these need Planning and Engineering approval first)
- the Heber City Fire Hazard Severity Form
What the remodel checklist asks for
The basement finish, remodel and deck checklist wants a dimensioned floor plan, room labels, load-bearing walls, window sizes and bedroom window well dimensions. Bedroom window wells taller than 44 inches need an attached escape ladder. Smoke alarms go in each bedroom and the adjacent area, with a carbon monoxide alarm outside bedrooms, all interconnected across levels. A remodel plan shows before and after.
Design criteria
| Item | Heber City value |
|---|---|
| Ground snow load | varies by address; use the USU snow load map |
| Frost depth | 36 inches |
| Wind | 105 mph, 3-second gust |
| Seismic design category | D |
| Weathering | Severe |
| Ice barrier | Required |
| Winter design temperature | 4ยฐF |
| Climate zone | 6B |
| Elevation (Manual J) | 5,600 ft |
| Flood hazard map | FIRM dated 3/15/2012 |
For comparison, Roy and Tooele design to a 30-inch frost depth. Ask a contractor from outside the valley which values their plans use. The seismic and snow load guide explains the Utah amendments.
Codes, July 1, 2026 to July 1, 2029
Heber City enforces the 2021 IRC (with Appendix AQ), the 2024 IBC, IPC, IMC, IFGC, IECC, IEBC and IFC, the 2021 ISPSC, the 2023 NEC and ANSI A117.1-2017, with the Utah state amendments.
Wildfire form
The Fire Hazard Severity Form is the city's amended Appendix C. It scores a site on subdivision design (number and surface of access roads, road width, road grade and more), and the fire department checks parts of it. It's on the residential submittal list, so expect your builder to complete it.
Doing the work yourself
Under Utah Code 58-55-305(1)(d), a sole owner may build on their own property for noncommercial use without a contractor license; anyone you pay who isn't your employee needs the license the work requires. Heber's building page doesn't describe an owner-builder process, so ask the department which form to file. See the handyman exemption for small paid jobs.
Check the contractor
Look up the business on the DOPL license lookup. The licensing guide lists the classifications.
Before you sign
- Look up the license.
- Check that the plans use a 36-inch frost depth and the snow load for your address.
- On a reroof, confirm ice barrier is in the price.
- Expect the permit fee at the end of review, and agree who pays it.
- Collect lien waivers before final payment (Utah lien law).
The hiring checklist covers each step. Nearby, see Park City and Provo, or all of Wasatch County. Browse Heber City roofers, HVAC contractors, remodelers, concrete contractors, plumbers and electricians, or get quotes.
Sources
- Heber City, Building Safety Division: contacts, hours, codes, design criteria, work hours.
- Heber City, Submitting Permit Requirements.
- Heber City, Basement Finish โ Remodels โ Deck submittal requirements.
- Heber City, Fire Hazard Severity Form.
- Utah Code 58-55-305: owner-builder exemption. Title 58, Chapter 55 is renumbered effective January 1, 2027, so this section will carry a new number after that date.
Frequently asked questions
What frost depth and snow load does Heber City use?
Heber City's Building Safety page lists a 36-inch frost depth. Ground snow load varies by address and is looked up on Utah State University's snow load map. Ice barriers are required.
How do I apply for a building permit in Heber City?
All permit applications are submitted, completed and paid for through the city's Online Permit Portal. Fees are paid at the end of review, before the permit is issued.
What hours can contractors work in Heber City?
The city's sound ordinance allows contractors to work from 7 a.m. to 10 p.m.
What is the Heber City Fire Hazard Severity Form?
It's the city's amended Appendix C form for scoring a site's wildfire hazard, with points for things like road access, road width and grade. It's listed with the residential building submittal requirements.