Quick answer
Lehi's Building and Inspection Department issues all building permits, and every application goes through its online Building Permit Submittal Portal. Inspections are booked only by phone at 385-201-1035 with 24 hours' notice. Retaining walls 4 feet or taller need their own engineer-stamped permit, and slopes over 10 percent fall under the Hillside Preservation chapter.
Lehi's Building and Inspection Department, at 153 N 100 E, issues every building permit in the city. Its process is fully electronic for plans and fully by phone for inspections, and its development code adds rules for hillside lots, tall retaining walls and historic properties.
How to apply
All permit applications go through the Building Permit Submittal Portal. From the Building and Inspections page:
- Everything is submitted electronically, including applications, compliance checks, structural reports and geotechnical reports.
- Plans are reviewed digitally and stamped on every page. The contractor must print the stamped approved plans and keep them on site for every inspection.
- You can check inspection status online with the permit number, site address, or subdivision and lot number.
The city posts checklists for a residential addition, a basement finish, a detached garage or shed over 200 square feet and new homes. Each asks for a complete building permit application with the contractor's license number and signature. An addition needs elevations, a floor plan, cross sections, footing and foundation details, electrical, plumbing and mechanical plans, a plot plan with distances to the property line, and a stamped engineering packet.
Solar projects also need an application to the Lehi City Power Department, and the city has a solar permit checklist.
Lehi's page says its current codes and design criteria are being updated. Call (385) 201-1035 with questions.
Inspections
- Call the Building Inspection Office at 385-201-1035, with 24 hours' notice.
- Inspections are not scheduled by voicemail, email or online.
- The city charges re-inspection fees when a project is clearly not ready. The building official's letter to contractors asks that jobs be ready before booking.
- Phone hours are Monday to Thursday, 7:30 a.m. to 5 p.m., and Friday, 8 a.m. to 3:30 p.m. The office is open Monday to Thursday, 8 a.m. to 5 p.m.
Re-inspection fees on a failed or early inspection can end up in your bill. Ask the contractor who pays them.
Hillside lots
Lehi's Hillside Preservation chapter (12-A) applies to any property with slopes of 10 percent or more:
- Grading, filling or building on a slope over 10 percent requires a soils report stamped by a Utah-licensed geotechnical engineer, a geologic report and map stamped by a Utah-licensed geologist, and a grading and drainage plan by a licensed engineer.
- No one may grade or build on a slope over 30 percent unless engineering measures accepted by the City Engineer or City Council address the hazards.
- No home may be built on fill unless it was compacted as directed by a licensed geotechnical engineer.
- No building permit is issued until the chapter's items are approved, and the final inspection can't be scheduled until required landscaping and retaining walls are installed.
If you're building or adding on in a hillside neighborhood, these reports come before the permit. Get them into the contractor's schedule and price.
Retaining walls
Under Chapter 12-C (new August 26, 2025), a retaining wall that holds 4 feet or more needs a building permit unless the chapter exempts it. The design must be specific to the site and stamped by a Utah-licensed civil, structural or geotechnical engineer. Submittals include structural calculations and drawings, a drainage plan, cross sections, a site plan and a copy of the geotechnical report. The wall permit is separate and isn't included in the permit for a new home, addition or remodel, so a landscaper's quote for a tall wall should include engineering.
Historic properties
Lehi has a Historic Preservation Overlay District and Landmark Sites chapter (07). For a property in a historic overlay district or a designated Landmark Site, no exterior change is authorized until the Historic Preservation Commission approves a Certificate of Appropriateness. That includes any work needing a building permit, additions and decks, window and door changes, porch work, siding and trim, masonry work, fences and walls, and any demolition. Applications go to the Zoning Administrator on the Planning Department's form, and the commission decides at a regular meeting.
Doing the work yourself
Lehi's pages don't describe an owner-builder process. Under Utah Code 58-55-305(1)(d), a sole owner may build on their own property for non-commercial use without a contractor license, and the city must notify DOPL when it issues that permit. Ask the department what it needs from you in place of a contractor license number.
Check the contractor
Look up the license on DOPL's license search. Remodel work under $7,000 can be exempt from licensing, but plumbing, electrical and HVAC work still needs licensed trades (handyman exemption). The Utah licensing guide explains the classifications.
Before you sign
- Get the DOPL license number. Lehi's application asks for it.
- On a hillside lot, confirm who orders the soils and geologic reports.
- Get a separate line for any retaining wall permit and engineering.
- For solar, confirm the Lehi City Power application is included.
- Collect lien waivers before final payment (Utah lien law).
The hiring checklist and the Utah permit guide cover each step. Nearby, see American Fork and Saratoga Springs, or all of Utah County. Browse Lehi plumbers, electricians, HVAC contractors, roofers, landscapers and remodelers.
Sources
- Lehi City, Building and Inspections: portal, electronic plans, inspection scheduling, hours, address, checklists, solar.
- Lehi City, residential addition, basement finish and detached garage or shed checklists.
- Lehi City Development Code, Chapter 12-A Hillside Preservation (amended 10/08/24).
- Lehi City Development Code, Chapter 12-C Retaining Walls (adopted 08/26/25).
- Lehi City Development Code, Chapter 07 Historic Preservation.
- Utah Code 58-55-305 and DOPL license search.
Frequently asked questions
How do I apply for a building permit in Lehi?
Through the Building Permit Submittal Portal on Lehi's Building and Inspections page. All plans, applications, structural reports and geotechnical reports are submitted electronically.
How do I schedule an inspection in Lehi?
Call the Building Inspection Office at 385-201-1035 and allow 24 hours' notice. Lehi will not schedule inspections by voicemail, email or online. Re-inspection fees are charged when a job is clearly not ready.
Does a retaining wall need a permit in Lehi?
Yes, if it retains 4 feet or more, unless the code exempts it. Chapter 12-C of the Lehi City Development Code requires a separate building permit with plans stamped by a Utah-licensed civil, structural or geotechnical engineer, plus drainage plans and a geotechnical report.
Do I need a separate approval for solar in Lehi?
Yes. Residential and commercial projects with solar must also submit an application to the Lehi City Power Department, in addition to the building permit.