Quick answer
Hurricane's Building Department (435-635-2811, 147 N 870 W) requires every new-construction permit to carry a notarized Acknowledgement, Waiver and Release in which the owner confirms a geotechnical report was obtained and releases the city from soil and groundwater claims. City inspections don't check compliance with that report. Sheds under 120 sq ft skip plan review but still need a permit for setbacks. Inspections need a City Inspect request by 3 p.m. the business day before.
Hurricane's Building Department signs off on homes on ground that the Utah Geological Survey flags for expansive soil, rock fall and flooding. The city's permit paperwork puts the soils risk on the owner in writing.
Who to call
From the city's Building Department page:
- Address: 147 N 870 W, Hurricane, UT 84737
- City offices: 435-635-2811
- Building Official: Larry Palmer, ext. 109, [email protected]
- Permit Technician: Tami Jones, ext. 122, [email protected]
- Building/Planning Clerk: Karri Richardson, ext. 120
- Power Department (talk to them before you apply): Mike Ramirez, (435) 635-5536
- Applications: City Inspect
Permit fees are paid online by e-check only, or in person by check or money order.
The soils waiver
Every new-construction permit needs a notarized Acknowledgement, Waiver and Release, with the original wet-stamped form delivered to the city before plan review is finalized. By signing, the owner states:
- Subsurface water, high groundwater, unstable soil or other geologic hazards have been found in areas of Hurricane, which may include this property.
- The owner has a geotechnical report from a competent engineer covering groundwater and soil conditions.
- The owner is responsible for building in strict compliance with that report, and city inspections won't check compliance with it.
- The owner releases the city from liability for damage tied to those conditions. The agreement runs with the land.
The city's pre-permit Geotechnical Data Sheet has the soils engineering firm agree to provide services during foundation and subgrade preparation and then issue a stamped foundation compliance report.
What this means for you: the city's inspector isn't the one checking the soils work. The geotechnical engineer is. Make sure your builder's contract names the engineer and includes their compliance report.
Why the soils matter here
The Utah Geological Survey's St. GeorgeβHurricane hazard study (Special Study 127, 2008) names expansive soil and rock as the most troublesome construction condition in southwestern Utah and flooding as the most widespread damaging hazard. It also flags landslides on weak clay-rich bedrock, rock fall, collapsible and gypsiferous soils, shallow groundwater, and active faults capable of magnitude 7 earthquakes. Hurricane is one of the principal communities in the study area.
Sheds and small structures
- Accessory structures under 120 square feet are exempt from building plan review, unless they include electrical or plumbing.
- A permit is still required to check setbacks and other development standards.
- No structure of any kind may sit in a public utility easement.
Design values
From the Building Department page:
| Item | Hurricane value |
|---|---|
| Ground snow load | 21 lbs |
| Wind | 105 mph, 3-second gust, Exposure C |
| Seismic design category | D |
| Footings | 12 in. wide by 12 in. deep |
| Frost line | 12 inches |
| Fire hydrant | within 250 ft of the back of the house |
Effective July 1, 2026, plans must show the 2021 IRC and the 2024 IBC as adopted by Utah. The seismic and snow load guide explains the state amendments.
Inspections
Schedule through your City Inspect builder account. Next-day requests must be in by 3 p.m. the business day before. Hurricane doesn't do same-day inspections.
Doing the work yourself
Owner-builders on new construction upload a signed Owner Builder Form. Under Utah Code 58-55-305(1)(d), a sole owner may build on their own property for noncommercial use without a license; anyone you pay who isn't your employee needs the license the work requires. You'll also be the one signing the soils waiver. See the handyman exemption.
Check the contractor
Look up the business on the DOPL license lookup, and check that the classification fits the work using the licensing guide.
Before you sign
- Look up the license.
- On a new home, get the geotechnical report and the engineer's foundation compliance report into the contract.
- Read the waiver before you sign it; it binds future owners too.
- Call the Power Department before you plan a service upgrade or solar.
- Collect lien waivers before final payment (Utah lien law).
The hiring checklist covers each step. Nearby, see Washington City and St. George, or all of Washington County. Browse Hurricane concrete contractors, landscapers, HVAC contractors, roofers, plumbers and remodelers, or get quotes.
Sources
- Hurricane City, Building Department: contacts, City Inspect, inspections, shed rule, design values, codes, forms.
- Hurricane City, Acknowledgement, Waiver and Release.
- Hurricane City, Pre-Building Permit Geotechnical Data Sheet.
- Utah Geological Survey, Geologic-Hazard Maps for the St. GeorgeβHurricane Area.
- Utah Code 58-55-305: owner-builder exemption. Title 58, Chapter 55 is renumbered effective January 1, 2027, so this section will carry a new number after that date.
Frequently asked questions
What is Hurricane's Acknowledgement, Waiver and Release?
It's a notarized form the property owner signs for a new construction permit. You acknowledge that subsurface water, high groundwater, unstable soils or other geologic hazards exist in parts of Hurricane, that you got a geotechnical report from a competent engineer, and that you'll build to its recommendations. You release the city from claims tied to those conditions, and the agreement runs with the land.
Do I need a permit for a shed in Hurricane?
Accessory structures under 120 square feet are exempt from building plan review unless they have electrical or plumbing, but the city says a permit is still required to check setbacks and other development standards. No structure of any kind is allowed in a public utility easement.
How do I schedule an inspection in Hurricane?
Through your City Inspect builder account. Next-day inspection requests must be in by 3 p.m. the business day before. Hurricane does not do same-day inspections.