No contractors found in Riverton yet
Check back soon or browse other cities.
Quick answer
Riverton requires a permit to build, alter, repair, move or demolish a building or to work on its electrical, gas, mechanical or plumbing systems. Sheds of 200 sq ft or less and 16 ft or less in height, fences up to 6 ft, and retaining walls up to 4 ft without a surcharge are exempt. Additions, accessory structures, in-ground pools and walkouts also need a land disturbance permit from the Stormwater Division. Call 801-208-3138.
Riverton's Building Department takes permit applications by email, not through a portal, and it pairs many building permits with a stormwater permit. Both are worth knowing before a contractor quotes a start date.
Who to call
From Riverton's building permits page:
- Building Department: 801-208-3138, [email protected]
- Residential questions: Kenneth Leany, 801-208-3123
- Building Official (commercial): Mark Smith, 801-208-3111
- Size, height, setbacks or easements: Planning and Zoning, 801-208-3149
- Stormwater (land disturbance permits): [email protected]
When you need a permit
Riverton says permits are required by Utah law and city ordinance, and that failing to get one is a class B misdemeanor. You need a permit before you build, enlarge, alter, repair, move or demolish a building, change its occupancy, or work on regulated electrical, gas, mechanical or plumbing systems.
What's exempt
- A one-story detached accessory structure (tool shed, storage shed, playhouse) of 200 square feet or less and 16 feet or less in height. It must still meet accessory-structure setbacks.
- A retaining wall 4 feet or less from the bottom of the footing to the top, unless it supports a surcharge.
- A fence up to 6 feet.
Land disturbance permit
To meet the Utah Clean Water Act and the city's MS4 stormwater permit, Riverton requires a land disturbance permit from the Stormwater Division before it approves a new-construction building permit. That covers:
- accessory structures
- additions
- in-ground pools and spas
- walkouts
The documents are on the city's land disturbance page. On a pool or walkout job, ask your contractor whether they've filed it. It's a separate approval from the building permit.
How to apply
- Download the fillable building permit application.
- Email it with plans, engineering and specifications to [email protected].
- Add the owner-builder and land disturbance forms if they apply.
Sign permits go to Planning and Zoning. The city posts a list of required inspections.
Demolition
A demolition permit needs the building permit application plus:
- utility disconnect letters from Rocky Mountain Power, Enbridge Gas, Riverton City Water, and Jordan Basin Improvement District sewer
- an asbestos and lead letter from the Utah Division of Air Quality (801-536-4000)
- a pre-demolition letter from the Salt Lake County health department (Water Quality Bureau, 385-468-3862)
Doing the work yourself
Riverton spells out what declaring yourself owner-builder means. You become your own general contractor and take liability for all the work. You may:
- do the work yourself
- use unpaid family, friends or neighbors (you're liable for their work)
- use your own employees, covered by workers' comp with payroll taxes withheld
- hire licensed subcontractors
Owner-builder declarations aren't allowed on commercial projects. On the application, list who performs each trade, with the contractor's information or the word "owner." File the city's Owner/Builder Certification form with the application. The state exemption behind it is Utah Code 58-55-305(1)(d) and (e).
Check the contractor
Look up every contractor you'll list on the permit on the DOPL license lookup. The licensing guide explains which classification covers which work, and the handyman exemption page covers jobs under $7,000.
Before you sign
- Get license numbers for the contractor and each trade.
- Ask whether the job needs a land disturbance permit, and who files it.
- Confirm setbacks with Planning and Zoning before a shed, pool or addition goes in.
- Collect lien waivers before final payment (Utah lien law).
The hiring checklist covers each step. Nearby, see Herriman and South Jordan, or all of Salt Lake County. Browse Riverton remodelers, concrete contractors, landscapers, fence builders, plumbers and electricians, or get quotes.
Sources
- Riverton City, Building Permits: permit rule, exemptions, demolition, owner-builder, land disturbance, contacts.
- Riverton City, Land Disturbance documents.
- Utah Code 58-55-305: owner-builder exemption. Title 58, Chapter 55 is renumbered effective January 1, 2027, so this section will carry a new number after that date.
Frequently asked questions
Do I need a permit for a shed in Riverton?
Not for a one-story detached shed, playhouse or storage building that is 200 square feet or less and 16 feet or less in height. It still has to meet the accessory-structure setbacks.
What is a land disturbance permit in Riverton?
It's a stormwater permit from the city's Stormwater Division. Riverton requires one before it approves building permits for new construction, including accessory structures, additions, in-ground pools and spas, and walkouts. Applications go to [email protected].
Is working without a permit illegal in Riverton?
Riverton's building page says permits are required by Utah law and city ordinance, and failing to get one is a class B misdemeanor.
How do I apply for a building permit in Riverton?
Fill in the city's fillable PDF application and email it, with plans, engineering and specifications, to [email protected]. Owner-builder and land disturbance forms may also be required.