No contractors found in Spanish Fork yet
Check back soon or browse other cities.
Quick answer
Spanish Fork's Building Department lists fences, garages and some decks, basement finishes, pools over 24 inches deep, water heaters, HVAC equipment, electrical and plumbing work, and structural framing changes among the projects that commonly need a permit. Applications and inspections go through the city's CitizenServe portal. Call 801-804-4540 if you're unsure.
Spanish Fork's Building Department works out of City Hall at 40 S Main St. The city publishes a short list of the work that usually needs a permit, and it reaches further than you might expect. Fences and water heater swaps are on it.
Who to call
From the city's Building Permits and Inspections page:
- Building Department: 801-804-4540 (the city's Building page says you can call or text this number)
- Building Inspection Secretary: Tammy Williams, 801-804-4540, [email protected]
- Building Permit Technician: Kelly Albrecht, 801-804-4547, [email protected]
- City main line: (801) 804-4500
- Applications and inspections: the city's CitizenServe portal
What commonly needs a permit
The city lists these:
- New buildings and accessory structures
- Home or building additions
- Basement finishes and other renovations
- Garages and some decks
- Pools over 24 inches deep
- Water heaters and HVAC equipment
- Electrical and plumbing work
- Changes to structural framing
- Signs
- Fences
The city doesn't publish an exemption list. It says to contact the Building Department if you're not sure your project needs a permit. A contractor who says a fence or a water heater "never needs a permit in Utah" is wrong about Spanish Fork.
Inspections
- Schedule through CitizenServe at least 24 hours ahead.
- Work must be ready by 8 a.m. on the scheduled day.
- If it isn't ready, a $93 re-inspection fee may apply.
- Underground work must be inspected before it is buried or covered with concrete.
The re-inspection fee lands on whoever holds the permit. Put in the contract who pays it if the contractor isn't ready.
Fees
The city's Building Fees page covers July 1, 2026 through June 30, 2027. The building permit fee is set by the 2021 IRC fee schedule, and a partial residential building permit is $90.
Accessory dwelling units
Spanish Fork has a separate Accessory Dwelling Units page. Check it before a contractor starts a basement apartment.
Doing the work yourself
The city's pages don't describe owner-builder rules. Under Utah Code 58-55-305(1)(d), a sole owner may build on their own property for noncommercial use without a contractor license, and unpaid helpers working under the owner are exempt under (1)(e). Anyone you pay who isn't your employee needs the license the work requires. For small paid jobs, see the handyman exemption.
Check the contractor
Look up the business on the DOPL license lookup. Water heater and furnace work is plumbing or HVAC work, so it needs a licensed plumbing contractor or a licensed HVAC contractor (S350). The licensing guide lists every classification.
Before you sign
- Look up the license and match it to the trade.
- Ask whether the contractor or you will pull the CitizenServe permit.
- Agree on who pays a re-inspection fee.
- Don't let concrete go over buried lines until they're inspected.
- Collect lien waivers before final payment (Utah lien law).
The hiring checklist covers each step. Nearby, see Springville and Provo, or all of Utah County. Browse Spanish Fork fence builders, plumbers, HVAC contractors, electricians, concrete contractors and remodelers, or get quotes.
Sources
- Spanish Fork, Building Permits & Inspections: permit list, inspections, contacts, portal.
- Spanish Fork, Building: call or text line, linked pages.
- Spanish Fork, Building Fees (July 1, 2026 to June 30, 2027): permit fee basis, partial permit fee.
- Utah Code 58-55-305: owner-builder exemption. Title 58, Chapter 55 is renumbered effective January 1, 2027, so this section will carry a new number after that date.
Frequently asked questions
Do I need a permit for a fence in Spanish Fork?
Spanish Fork's Building Permits and Inspections page lists fences among the projects that commonly require a permit. Call the Building Department at 801-804-4540 to confirm for your fence.
Do I need a permit to replace a water heater or furnace in Spanish Fork?
Yes. The city lists water heaters and HVAC equipment among the projects that commonly need a permit.
How do I schedule an inspection in Spanish Fork?
Schedule through the CitizenServe portal at least 24 hours ahead. Work must be ready by 8 a.m. on the scheduled day, or a $93 re-inspection fee may apply. Underground work must be inspected before it is buried or covered with concrete.