In Utah, the Legislature writes the building code and your city or county enforces it. That split matters. Your building department can't hand you a stricter local code on most subjects, and it can't skip inspections the state code requires. This page covers which codes apply, who issues permits, what work needs one, and when you can pull your own.

One code for the whole state

The State Construction Code is adopted by statute, and every political subdivision must follow it (Utah Code 15A-1-204(1)). Owners must comply when doing new construction and when voluntarily repairing, remodeling, altering, enlarging or changing the use of an existing building (15A-1-204(1)(b)).

The adopted editions are listed in Utah Code 15A-2-103. As of July 1, 2026, they include:

Code Edition
International Residential Code (houses, duplexes, townhouses) 2021
International Building Code 2024
International Plumbing Code 2024
International Mechanical Code 2024
International Fuel Gas Code 2024
National Electrical Code 2023
International Energy Conservation Code 2024
International Existing Building Code 2024

A version of 15A-2-103 that takes effect January 1, 2027 keeps the same editions.

The state then amends those codes in Title 15A, Chapter 3 (statewide amendments) and Chapter 4 (amendments that apply only in named cities or counties). The Utah amendments to IRC Chapters 1 through 5 are in 15A-3-202. Seismic and snow load amendments are covered on Utah building code: seismic and snow loads.

Limits on local add-ons

Since December 1, 2016, a city, county or state agency may not adopt or enforce a rule more restrictive than the State Construction Code on a subject the code specifically addresses, except as state law allows (15A-1-204(8)). The exceptions are narrow: enforcing federal law, rules for the government's own buildings, and some pre-2015 rules needed to prevent imminent injury or death (15A-1-204(9)). Zoning, setbacks and design standards are separate from the building code, so your city still controls those.

Who issues permits and inspects

The compliance agency having jurisdiction, usually your city or county building department, is responsible for inspection and enforcement (15A-1-207). Each compliance agency must offer a way to appeal a disputed code interpretation. If it doesn't, the Uniform Building Code Commission hears the appeal within 45 days.

Single-family permit applications must carry a notice that decisions are subject to review by the city's or county's chief executive and appeal under the IRC (15A-1-209(4)). Permits use a standardized form and numbering system, and the form must list the owner, the contractor, the parcel number and whether the applicant is an original contractor or owner-builder (15A-1-209(2)-(3)).

Two more state rules show up on your permit:

  • A 1% state surcharge is added to every building permit (15A-1-209(5)).
  • The city must send the permit to the State Construction Registry within 15 days, and the original contractor must post a copy at the job site (38-1a-205). That registry is where lien notices are filed; see Utah mechanics' lien law.

Electrical, plumbing and mechanical work is permitted and inspected by the same local building department. A licensed contractor's state license and its local business license are the only licenses a city may require of it to do business (58-55-301(1)(b)-(c)).

Third-party inspectors

After you request an inspection, you may hire a third-party inspection firm from the local regulator's approved list to do it. You notify the city first, the firm files its report with the city, and the city pays the firm for an inspection within the original scope. Once the firm submits the final report, the city must issue the certificate of occupancy or letter of completion (15A-1-105).

Which work needs a permit

The IRC requires a permit for construction, enlargement, alteration, repair, moving, demolition or change of occupancy of a building, and for installing or altering electrical, gas, mechanical or plumbing systems, unless the work is on the code's exempt list (2021 IRC Section R105). Utah amends that exempt list in 15A-3-202(5)-(6):

  • Retaining walls retaining less than 4 feet of unbalanced fill are exempt, unless they support a surcharge or need design under R404.4.
  • Decks no more than 30 inches above grade at any point, not requiring guardrails and not serving the required exit door, are exempt.
  • Grade-level, unconnected conex boxes under 350 square feet, used only for storage, are exempt.

Salt Lake City's Building Services FAQ is a useful local example. It says:

  • Permit needed: structural changes such as adding or removing walls; installing or altering electrical, plumbing or HVAC systems; roof repairs and replacements; replacing exterior doors or windows; and fences and retaining walls.
  • No permit: painting, papering, flooring and similar finish work; residential sheds and playhouses under 200 square feet; retaining walls not over 4 feet.
  • Fees are based on project value, and starting work without a permit can mean a double fee.

Other cities draw some of these lines differently, especially for fences. Call your building department before you start, and check the city page for your area under Utah cities.

Existing homes

Utah adds a sentence to IRC R101.2: the code does not require modifications to a building component that is not being altered as part of an alteration, replacement or repair (15A-3-202(1)). A kitchen remodel doesn't force you to rebuild the stairs.

Utah also protects existing basement bedrooms. If an egress window is smaller than today's code but met the code when the bedroom was finished, you don't have to enlarge it if doing so would compromise the structure or couldn't meet other requirements such as setbacks and window wells (15A-3-202(4), new IRC R102.7.2).

Farm buildings

A structure used only for agriculture and not for human occupancy is exempt from the State Construction Code, though plumbing, electrical and mechanical permits may still be required. The exemption doesn't apply on less than five contiguous acres inside a city or town, or less than two acres in a county-approved subdivision, unless the land is in an agriculture protection area (15A-1-204(11)).

Owner-builders

You don't need a contractor's license to build on your own property if you fit the sole owner exemption. It covers building no more than one residential structure per year, and no more than three per five years, on your own property for your noncommercial, nonpublic use, plus sheds, carports and detached garages incidental to the home (Utah Code 58-55-305(1)(d)). Unpaid volunteers working under your direction are also exempt (58-55-305(1)(e)). Anyone else you hire who needs a license must have one.

When a building department issues a permit to an owner under this exemption, it must notify DOPL (58-55-305(2)). Salt Lake City requires an Owner/Builder Certification with plan review documents, lets owners pull permits only for an owner-occupied primary residence, and requires a contractor for rentals and commercial property.

A separate exemption lets owners and their regular employees maintain their own property (58-55-305(1)(j)).

On January 1, 2027, the licensing act is renumbered and these exemptions move to Utah Code 58-55-110 (Chapter 42, 2026 General Session). The new text still exempts a sole property owner building one residential structure a year and three per five years (58-55-110(2)(p)).

Two cautions if you act as your own builder:

  • You become the original contractor for lien purposes (38-1a-104), so subs and suppliers you hire can lien your property, and the Chapter 11 lien shield for paid-in-full owners won't apply to them.
  • You take on code compliance for every inspection.

Hiring a contractor who pulls the permit

When a contractor pulls the permit, confirm the name on the permit matches the license in DOPL's license lookup. A contractor that offers to skip the permit is asking you to carry the risk. Unpermitted work can surface at resale, in an insurance claim, or when the next permit triggers an inspection of old work.

Small jobs under $7,000 may be done by an unlicensed handyman, but plumbing, electrical and HVAC work still requires licensed trades. See the handyman exemption and the trade pages for electrical, plumbing and HVAC.

Utah permit checklist

  1. Call your building department and describe the job. Ask what plans and inspections are required.
  2. Ask whether zoning approval (setbacks, height, lot coverage) is a separate step. HOA rules are separate again.
  3. Decide who pulls the permit, and put that in the contract.
  4. Post the permit at the site and keep a copy.
  5. Don't cover work before it's inspected.
  6. Keep the final inspection or certificate of occupancy with your house records.

For the full hiring process, see the hiring checklist and the Utah licensing guide.

Sources

Frequently Asked Questions

Who issues building permits in Utah?

Your city or county building department, which Utah law calls a compliance agency. It issues permits for work regulated by the State Construction Code and is responsible for inspections and enforcement (Utah Code 15A-1-202 and 15A-1-207). There is no separate state trade permit for plumbing, electrical or HVAC work in a city that issues permits.

Can a Utah city adopt stricter building codes than the state?

Generally no. After December 1, 2016, a state agency or political subdivision may not adopt or enforce a rule that is more restrictive than the State Construction Code on a subject the code specifically addresses, with narrow exceptions (Utah Code 15A-1-204(8)-(10)). Local amendments are adopted by the Legislature in Chapter 4 of Title 15A.

Can I pull my own building permit in Utah?

Yes, for a home you own and will use yourself. Utah Code 58-55-305(1)(d) exempts a sole owner building one residential structure a year (and no more than three in five years) on their own property for noncommercial use, plus sheds, carports and garages. Salt Lake City, for example, requires an Owner/Builder Certification with the plans and requires a licensed contractor for rental and commercial properties.

Does a deck need a permit in Utah?

Utah's amendment to IRC R105.2 exempts decks that are no more than 30 inches above grade at any point, don't require guardrails, and don't serve the exit door required by R311.4 (Utah Code 15A-3-202(5)(b)). Higher decks need a permit. Your city may still require zoning approval.

Can I use a private inspector if the city is slow?

After you request an inspection, you may hire a third-party inspection firm from your local regulator's approved list. You notify the local regulator first, the firm sends its report to the city, and the city pays the firm for inspections within the original scope (Utah Code 15A-1-105).