No contractors found in Draper yet
Check back soon or browse other cities.
Quick answer
Draper won't accept plans for a new home, townhouse or twin home until a geotechnical report for that parcel has been reviewed and approved by the city. A roof replacement or a roof recover needs a permit; a localized roof repair does not. In the city's wildland-urban interface areas, a reroof must use the roof covering required for new construction. The Building Division is at (801) 576-6399.
Draper sits against the Wasatch front and the Traverse Mountains, and its building rules show it. The city wants a reviewed soils and geology report before it will look at plans for a new home, and its roofing policy carries a wildfire rule for homes in the wildland-urban interface.
Who to call
From Draper's Building Permits page:
- Building office: (801) 576-6399, [email protected]
- Address: 1020 E. Pioneer Rd., Draper, UT 84020
- Hours: weekdays, 8 a.m. to 5 p.m.
- Applications, status and inspections: the Draper City Online Services Portal (account required)
Draper requires a permit and inspection for new construction and for remodeling a home. The submittal checklists for additions, basements, decks, retaining walls and new homes live inside the portal.
Geotechnical report first
Draper will not accept plans or a permit application for a home, townhouse, apartment, commercial building or twin home unless:
- a permit can be issued at the time of submittal, and
- a geotechnical engineering report for that parcel has been reviewed, approved and accepted by the city.
The city's Geotechnical Engineering Standards (December 16, 2025) set the minimum work for those reports. Appendices cover fault activity investigations, slope stability, liquefaction, debris flow and rockfall. When a report is required, it goes to the Building Division. The Building Permits page also links a deposit form for geologic peer review.
What this means for you: on a new home or a big addition on a hillside lot, the geotechnical engineer is part of the schedule before the builder can even submit. Ask your builder who the engineer is and whether the report has been accepted by the city.
Roofing: repair, recover or replace
Draper's Roofing Permit Policy uses the IRC definitions:
- Roof repair: localized replacement of damaged material. No permit, but the manufacturer's instructions still apply.
- Roof recover: a new covering installed over the existing one. Permit required.
- Roof replacement: tear-off, substrate repair and a new covering. Permit required.
All roofing work has to follow IRC Sections R905 and R908.
Wildland-urban interface homes
If your home is in a designated WUI area, the policy applies the International Wildland Urban Interface Code. When a roof is replaced, or 25% or more of the roof area is replaced within a 12-month period, the new covering must be the one required for new construction for that home's ignition-resistant construction class (IWUIC Section 503). A roofer who quotes a like-for-like shingle swap on a WUI home may be quoting a covering the city won't pass. Ask whether your address is in the WUI before you compare bids.
Accessory dwelling units
Draper's ADU page notes that city ordinances did not allow an internal ADU before October 1, 2021. If you're adding a basement apartment, start with the Planning Office at (801) 576-6399 or [email protected] before you hire anyone to frame it.
Doing the work yourself
Draper's permit page doesn't address owner-builders. State law lets a sole owner build on their own property for noncommercial use without a contractor license, under Utah Code 58-55-305(1)(d). Anyone you pay who isn't your employee must hold the license the work needs. The handyman exemption page covers small jobs under $7,000.
Check the contractor
Look up the business and any trade subcontractors on the DOPL license lookup. Roofing is classification S280; general building and residential work is B100 or R100. The Utah licensing guide explains the rest.
Before you sign
- Confirm the license number and classification.
- On new construction or an addition, confirm the geotechnical report is approved before you count on a start date.
- For a reroof, ask whether the home is in the WUI and which roof covering the city requires.
- Get the permit number from the portal and watch the inspections post.
- Collect lien waivers before final payment (Utah lien law).
The hiring checklist walks through the full process, and the seismic and snow load guide explains the Utah code amendments. Nearby, see Sandy and Riverton, or all of Salt Lake County. Browse Draper roofers, remodelers, concrete contractors, landscapers, plumbers and electricians, or get quotes.
Sources
- Draper City, Building Permits: contacts, portal, geotechnical report rule.
- Draper City, Roofing Permit Policy: repair, recover and replacement; WUI roof rule.
- Draper City, Geotechnical Engineering Standards (12/16/2025): fault, slope, liquefaction, debris flow and rockfall appendices.
- Draper City, Accessory Dwelling Units: internal ADUs allowed from October 1, 2021; Planning contact.
- Utah Code 58-55-305: owner-builder exemption. Title 58, Chapter 55 is renumbered effective January 1, 2027, so this section will carry a new number after that date.
Frequently asked questions
Do I need a permit to replace a roof in Draper?
Yes. Draper's Roofing Permit Policy says a roof replacement (tearing off and installing a new covering) and a roof recover (a new layer over the old one) both need a city permit. A roof repair, meaning localized replacement of damaged material, does not.
Why does Draper require a geotechnical report?
Draper will not accept building plans or permit applications for homes, townhouses, apartments, commercial buildings or twin homes until a geotechnical engineering report for the parcel has been reviewed, approved and accepted by the city. The city's Geotechnical Engineering Standards include minimum standards for fault, slope stability, liquefaction, debris flow and rockfall investigations.
What changes for a reroof in a Draper wildland-urban interface area?
Under the roofing policy, if a roof in a designated WUI area is replaced, or 25% or more of it is replaced within 12 months, the new covering must meet the new-construction requirement for that site's ignition-resistant construction class under Section 503 of the International Wildland-Urban Interface Code.
How do I apply for a permit in Draper?
Apply through the Draper City Online Services Portal at draper.onlama.com. You need an account. The portal also shows permit status and inspection results.